How to Build a Funding Case for Your Diversion Project

Written by Wastebits Staff in Recycling & Diversion / September 24, 2026
A white recycling symbol on the side of a blue plastic bin

A strong diversion proposal starts with waste weights, actual bills, and a workable floor plan. Learn how to show what will change, what it will cost, and how you will measure results.

Before you ask for money to keep more waste out of disposal, build a case your plant manager can check. This guide shows how to establish current volumes and costs, plan the work, and set measurable targets. You will have the facts needed to explain what the funding buys and whether the project delivers.

Define the Material and the Project Boundary

Start with one clearly defined material and where it comes from. A proposal to collect clean stretch wrap from two packaging lines is easier to evaluate than a promise to improve recycling across the plant. Name the collection points, shifts, storage area, and proposed receiving facility. Explain what is included and what stays outside the project.

Diversion means sending material to an accepted reuse or recycling route instead of disposal. Putting material in a different bin does not prove that happened. Your proposal needs a way to confirm that the receiver accepted it. Set that expectation before you estimate diverted tons.

Build a Baseline From Actual Records

A baseline is the starting point you will compare future results against. Choose a period that reflects normal operations, such as three representative months. If production changes sharply by season, use a longer period or show those swings separately. Pull scale tickets, pickup records, vendor invoices, and production totals for the same dates.

Match each load to its material, weight, destination, and charge. Keep pounds and tons consistent, and clearly mark estimated weights. A full bin is not a reliable weight measurement because loose packaging and dense scrap fill space differently. If shared containers hide your target material, arrange a short measurement period before presenting a firm estimate.

The EPA recommends tracking waste and reviewing facility operations to identify improvement opportunities. Its guide to managing and reducing waste provides a useful starting point. Walk the proposed collection route with an operator and the person who moves the bins. Check whether the records match what actually leaves the floor.

Separate Current Spending From Avoidable Costs

Add up what the facility pays to handle the material today. Include hauling, disposal, container rental, added fees, and staff time spent moving or sorting it. Check invoices against the service agreement so you understand minimum charges and pickup frequency. Show unusual cleanup charges separately from routine expenses.

Then identify which charges would actually fall after the change. Removing two tons from a trash container may save nothing if the monthly bill stays fixed. Savings may require fewer pickups, a smaller container, or a revised agreement. Ask the hauler to price the proposed service change before counting that reduction.

polypropylene recycling
Related ReadingHow $300M Propelled PureCycle’s Global Plastic Recycling Expansion—and What It Means for Waste Management
Read Article

Treat recovered labor time carefully. Ten fewer minutes moving bins each shift may help production, but it does not automatically reduce payroll. Report that time as an operating benefit unless it removes a real expense, such as overtime. Keep cash savings and time savings separate so finance can review both.

Describe What Changes on the Floor

Write the proposed process from the point where material becomes waste to the point where the truck leaves. Show where bins will sit, what their labels will say, and who empties them. Include the route to the storage area and the pickup trigger. A trigger might be a marked storage limit or a scheduled weekly check.

From Collection Point to Pickup

Make labels specific to the material the receiver accepts. For a stretch-wrap project, use photos of accepted wrap and common rejected items. Explain who handles a bin containing strapping, food waste, or other unwanted material. Assign someone to check the bins on every participating shift.

The handoff needs equal attention. Name who requests the pickup, meets the driver, records the load, and files the paperwork. Confirm space and equipment needs with operations before adding a baler or extra containers. Include training, maintenance, and backup coverage in the budget.

Confirm the Vendor’s Terms Before Estimating Revenue

A low hauling quote can become expensive if the facility cannot consistently meet the receiving rules.

Get written acceptance requirements from the proposed receiver. Ask about material condition, packaging, minimum shipment size, and what happens when a load fails inspection. Confirm who pays for rejected loads and return transportation. A low hauling quote can become expensive if the facility cannot consistently meet the receiving rules.

Request pricing that separates transportation, processing, container charges, and any payment for recovered material. Note how long the quote remains valid and whether payment changes with market prices. Build a conservative case with no material revenue if that revenue is uncertain. Show potential revenue separately so approval does not depend on the best possible month.

Compare the Full Cost With Expected Savings

Separate one-time purchases from ongoing expenses. Bins, signs, equipment installation, and startup training belong in the initial request. Recurring hauling, supplies, maintenance, and added labor belong in the operating forecast. Use the same time period for current and proposed costs.

Consider a hypothetical project requiring $6,000 upfront. A confirmed service change would reduce existing charges by $900 per month, while new hauling and operating costs would total $500 per month. The expected net savings would be $400 per month. Simple payback—the time for savings to recover the initial expense—would be 15 months.

Related ReadingOrganics Diversion in Manufacturing: Where It Works and Where It Breaks
Read Article

Test a less favorable case before presenting that figure. If avoidable charges fall by only $700 per month, net savings drop to $200 and payback stretches to 30 months. Explain which assumptions create that difference. This gives the approver a useful range and identifies what the pilot must verify.

Set Pilot Targets and Keep the Proof

Track production too, so a slow month does not look like a waste reduction success.

Start with a limited pilot, such as one department for eight weeks. Set targets for accepted weight, total cost, rejected loads, and added handling time. Track production too, so a slow month does not look like a waste reduction success. Pounds disposed per thousand units produced can help make that comparison fairer.

Assign a record owner and a review date before the first pickup. Keep weight tickets, acceptance records, invoices, and exception notes together under the same load reference. Check that material collected during the pilot was actually shipped and accepted. Material waiting in storage should be reported separately from confirmed diversion.

Finish the funding request with a clear decision rule. State what result supports expansion, what needs correction, and what would stop the project. Include the requested amount, responsible owner, expected savings range, and supporting quotes. That gives management a proposal it can approve and later evaluate.

Schedule a Demo

Wastebits software dashboard

A funding proposal gets harder to defend when weights sit in a spreadsheet, invoices stay in email, and pickup details leave with the last shift. Bring one proposed diversion project and a sample of its records to a Wastebits demo. Use the session to evaluate how your team could connect daily waste handling with the evidence management needs. Focus on three concrete benefits:

  • Less time gathering load records and vendor paperwork for reviews.
  • Clearer comparisons between baseline costs and project results.
  • Easier handoffs when staff coordinate pickups and resolve missing information.

Schedule a Demo to walk through your current process and reporting needs. Ask to follow a load from collection through acceptance and cost review. That will help you judge how Wastebits could support your funding case and ongoing results.